Head office in Dubai · Branch in Abu Dhabi. Request a quote today

Environmental Treatment

We treat soil contaminated with oil around wells and stations and return it as clean soil suitable for cultivation, while extracting the oil it contains. Sludge is collected from the well pits and brought to the treatment site, where it is processed and the oil is recovered.

The group has treated more than 440 contaminated oil pits and recovered over 146,000 cubic metres of oil and sludge oil, including 232 pits at the Al-Thawra field, 125 pits at the Al-Jbisah field and 85 pits at the Al-Kharrata field.

Scope of Work

Typical scope we take responsibility for under this service, and what you receive at handover.

  • Oil-pit sludge collection and treatment
  • Oil recovery from sludge
  • Remediation of oil-contaminated soil
  • Tank cleaning and sludge removal
  • Treatment plan and method statement
  • Volumes of oil recovered
  • Soil test results
  • Chain-of-custody records

Have a Question?

  • Which standards do you work to?

    Pressure work, piping and vessel fabrication follow ASME Section I/VIII and B31.x codes, with material traceability and NDT verification.

  • How do you manage safety on site?

    Every phase is governed by HSE protocols, job hazard analyses, permit-to-work systems, toolbox talks and regular site inspections.

  • What documentation do you hand over?

    Test packages, material certificates, weld and NDT records, and as-built documentation, signed off with the client.

  • How can I request a quotation?

    Send us your scope through the contact page or call our commercial team, and we will get back to you.

Go To Top