Head office in Dubai ยท Branch in Abu Dhabi. Request a quote today

Field Pipelines 4"โ€“10" with Total โ€” Deir ez-Zor
  • Client : Total (as subcontractor)
  • Category : Pipelines
  • Date : July 2008
  • Status : Completed
  • Location : Deir ez-Zor, Syria
  • Tags : pipelines, fabrication

Project Description

Fabrication and installation of intermediate and warehouse pipelines in sizes from 4 to 10 inches, 128 km in total.

Many line sizes and tie-in points across an operating oil field.

What We Did

To keep the terminal running safely and without interruption, we put the following in place on site.

  • Spool fabrication ahead of installation.

  • Permit-to-work control inside the field.

  • Full material traceability.

Final Results

128 km of field pipelines installed and handed over.

  • Line lists and weld maps
  • Test packages
  • As-built drawings
Go To Top