Baniyas Power Plant 800 MW — Units 1 & 2 Rehabilitation
  • Client : Ansaldo (main contractor)
  • Category : Power plants
  • Date : 2004 – 2006
  • Status : Completed
  • Location : Baniyas, Syria
  • Tags : rehabilitation, pressure parts

Project Description

Rehabilitation of units 1 and 2: removal of pressure parts, air-heater elements and steel structure, following ASME and ASTM procedures.

Working on large boiler components inside an existing plant.

What We Did

To keep the terminal running safely and without interruption, we put the following in place on site.

  • Rigging and lifting plans.

  • ASME and ASTM procedures.

  • Coordination with the main contractor.

Final Results

Units prepared for renewal on schedule.

  • Removal and inspection records
  • QA documentation