Office C10, Aswaaq Mall, Al Mizhar 1,
Dubai, UAE. P.O. Box 123654
Rehabilitation of units 1 and 2: removal of pressure parts, air-heater elements and steel structure, following ASME and ASTM procedures.
Working on large boiler components inside an existing plant.
To keep the terminal running safely and without interruption, we put the following in place on site.
Units prepared for renewal on schedule.